5 Common Building Mistakes to Avoid
Across Africa’s fast growing cities, construction timelines are tight and expectations are high. Yet many projects still run into the same avoidable pitfalls that drive delays, budget creep, and quality issues. This guide distils five common building mistakes we see on projects of all sizes and explains how to prevent them with disciplined planning, strong procurement, and smart technology.
Stericon combines engineering excellence with digital tools to give owners and contractors real visibility from design through handover. Below are practical steps you can put to work on your next build.
1. Weak preconstruction planning
Projects that rush into mobilisation without a complete scope, coordinated drawings, and a realistic schedule almost always pay for it later. The World Bank notes that closing Africa’s infrastructure gap demands better project preparation and governance, not only more money. See the context here: World Bank on infrastructure preparation.
How to avoid it: lock scope, run design reviews, build a work breakdown structure, and validate long lead items before notice to proceed. Agree success criteria and quality benchmarks early and document them.
2. Informal procurement and supplier risk
Unstructured procurement leads to price volatility, substitution, and hidden delays. A data driven vendor strategy with clear evaluation criteria and performance tracking reduces risk and improves value. For broader trends on supply resilience, see McKinsey insights on operations and supply.
How to avoid it: standardise RFQs, prequalify suppliers, use framework agreements for key materials, and monitor logistics against programme milestones.
3. Insufficient site quality control
Quality issues caught late are costly to rework and can undermine safety. Simple controls like checklists, inspection test plans, and hold points tighten execution. Linking quality records to drawings and method statements keeps everyone aligned.
How to avoid it: implement inspection test plans for critical trades, require documented approvals at hold points, and keep a punch list that is visible to all stakeholders.
4. Safety treated as a box tick
Safety is productivity. Incidents slow work, damage morale, and increase total cost. International benchmarks and practical tools are available from the International Labour Organization. See resources here: ILO safety and health at work.
How to avoid it: integrate task risk assessments into daily briefings, track leading indicators, and align subcontractors with a single site safety plan.
5. No single source of truth
When drawings, RFIs, schedules, and site reports live in different places, teams make decisions on stale information. A single, shared environment reduces errors and speeds approvals.
How to avoid it: use a common data environment that links drawings, RFIs, submittals, and field photos to each activity. Set clear ownership for updates and reviews.
Stericon’s approach: engineering discipline plus digital visibility
We bring structured preconstruction, rigorous procurement, and site quality systems together with practical technology. Our team uses coordinated schedules, issue tracking, and live dashboards so owners, consultants, and contractors see the same facts in real time.
- Preconstruction: scope lock, risk register, and design coordination
- Procurement: vendor prequalification, contract clarity, and delivery tracking
- Quality and safety: inspection plans, hold points, and daily briefings
- Digital: common data environment and field reporting tied to programme
Explore how we support owners and contractors across construction, procurement, ICT, and smart solutions: Stericon Services.
What good looks like on the next project
Success comes from consistency. The teams that plan carefully, buy smart, check quality early, and share the same data finish stronger. With urban growth accelerating across the continent, the winners will be the builders who combine engineering discipline and digital clarity.
Partner with Stericon
At Stericon, we help project owners and contractors avoid costly mistakes with clear planning, reliable procurement, and site visibility from day one. Contact us to discuss your next project.
All Categories
Recent Posts
5 Common Building Mistakes to Avoid
Hello world!
MON-SAT 8:00-9:00
+91 69 863 6420